Publication:

House Mill:: Three Mills Lane: London E3

    Full details

    Authors & editors

    Publisher Julian Harrap Architects
    Year of publication 1974
    Languages

    English (main text)

    Medium Book
    Edition1
    Topics

    Tags

    Scope & contentA study of the present condition of the House Mill and the repairs necessary to enable it to be used as a museum (1974), for Passmore Edwards Museum London Borough of Newham. .Index Foreward Preliminary Study Architect's Brief Approach to repair Consultants Acknowledgements 1. The House Mill and How it worked- Description of the House Mill. How the Mill worked 2. History and National Importance- History, Location, Environment, National and Local Significance 3. Introduction to the Survey- General condition, changes in use and structure 4. Report of Survey- A-Building construction B-Building construction, Problems, Repair. 5. The Museum- Architect's brief, Constraints of the building, constraints of the site, scheme for the museum 6. Financial implications- approximate estimate, basis for costs, Millwright's work, Grants, Urgent repairs. 7. Recommendations. Appendices 1. Report of the engineer. 2. Report of the quantity surveyor. 3. Report of the Millwright. 4. Report of the Fire Consultant 5. Report of the Services Engineer 6. Report of the Timber Preservation specialists. 7. Survey Drawings.

    Copies held

    Accession no. 229854

    • Shelf location: [unknown]
    • Notes: A study of the present condition of the House Mill and the repairs necessary to enable it to be used as a museum (1974), for Passmore Edwards Museum London Borough of Newham. .Index Foreward Preliminary Study Architect's Brief Approach to repair Consultants Acknowledgements 1. The House Mill and How it worked- Description of the House Mill. How the Mill worked 2. History and National Importance- History, Location, Environment, National and Local Significance 3. Introduction to the Survey- General condition, changes in use and structure 4. Report of Survey- A-Building construction B-Building construction, Problems, Repair. 5. The Museum- Architect's brief, Constraints of the building, constraints of the site, scheme for the museum 6. Financial implications- approximate estimate, basis for costs, Millwright's work, Grants, Urgent repairs. 7. Recommendations. Appendices 1. Report of the engineer. 2. Report of the quantity surveyor. 3. Report of the Millwright. 4. Report of the Fire Consultant 5. Report of the Services Engineer 6. Report of the Timber Preservation specialists. 7. Survey Drawings.