House Mill:: Three Mills Lane: London E3
Full details
Authors & editors | |
Publisher | Julian Harrap Architects |
Year of publication | 1974 |
Languages | English (main text) |
Medium | Book |
Edition | 1 |
Topics | |
Tags | |
Scope & content | A study of the present condition of the House Mill and the repairs necessary to enable it to be used as a museum (1974), for Passmore Edwards Museum London Borough of Newham. .Index Foreward Preliminary Study Architect's Brief Approach to repair Consultants Acknowledgements 1. The House Mill and How it worked- Description of the House Mill. How the Mill worked 2. History and National Importance- History, Location, Environment, National and Local Significance 3. Introduction to the Survey- General condition, changes in use and structure 4. Report of Survey- A-Building construction B-Building construction, Problems, Repair. 5. The Museum- Architect's brief, Constraints of the building, constraints of the site, scheme for the museum 6. Financial implications- approximate estimate, basis for costs, Millwright's work, Grants, Urgent repairs. 7. Recommendations. Appendices 1. Report of the engineer. 2. Report of the quantity surveyor. 3. Report of the Millwright. 4. Report of the Fire Consultant 5. Report of the Services Engineer 6. Report of the Timber Preservation specialists. 7. Survey Drawings. |
Copies held
Accession no. 229854
- Shelf location: [unknown]
- Notes: A study of the present condition of the House Mill and the repairs necessary to enable it to be used as a museum (1974), for Passmore Edwards Museum London Borough of Newham. .Index Foreward Preliminary Study Architect's Brief Approach to repair Consultants Acknowledgements 1. The House Mill and How it worked- Description of the House Mill. How the Mill worked 2. History and National Importance- History, Location, Environment, National and Local Significance 3. Introduction to the Survey- General condition, changes in use and structure 4. Report of Survey- A-Building construction B-Building construction, Problems, Repair. 5. The Museum- Architect's brief, Constraints of the building, constraints of the site, scheme for the museum 6. Financial implications- approximate estimate, basis for costs, Millwright's work, Grants, Urgent repairs. 7. Recommendations. Appendices 1. Report of the engineer. 2. Report of the quantity surveyor. 3. Report of the Millwright. 4. Report of the Fire Consultant 5. Report of the Services Engineer 6. Report of the Timber Preservation specialists. 7. Survey Drawings.